Friday, January 16, 2015

2015 Finish-along.....

I found a link-up for winning prizes for finishing quilts this year.

Go here On the windy side and find out the details from Adrianne.

Now for my first quarter list
1. I need to quilt and bind my Shamrock top. It has only been waiting since last February.

2. This top is actually already assembled, but needs to be quilted.

 3. Another finished top that needs to be quilted.

My list is kind of short, but these are just the tip of a gigantic pile of unfinished quilt tops. I quilt for Customers and fail to finish my own quilts. So thank you Adrianne for hosting the "Finish-along"

Thursday, January 15, 2015

I am weak...

I ordered the book tonight. This quilt has been calling me. But I have not been able to see what other quilts are in the book. Soon as I have it I will share what I can.

Sunday, January 11, 2015

Finally feeling better...


After this cold my inner ear has cleared out and I have not been dizzy. Hope that the calcium crystals stay away. 
It is Downton Abbey night and the only TV that it comes in on is in my quilting room. I will be doing some quilting tonight on the green x-stitch quilt.
This was when I first put it on the machine. I currently have around two thirds of it quilted. 
Have about five quilts that I would love to get quilted befor the A1 arrives. I am looking forward to quilting on the new machine and hope it will be ready to hit the ground quilting. February is coming fast!