I found a link-up for winning prizes for finishing quilts this year.
Go here On the windy side and find out the details from Adrianne.
Now for my first quarter list
1. I need to quilt and bind my Shamrock top. It has only been waiting since last February.
2. This top is actually already assembled, but needs to be quilted.
3. Another finished top that needs to be quilted.
My list is kind of short, but these are just the tip of a gigantic pile of unfinished quilt tops. I quilt for Customers and fail to finish my own quilts. So thank you Adrianne for hosting the "Finish-along"


