Friday, November 16, 2012

Trip to Mary Jo's.....

 I got my gray and some B&W, turquoise, and lime green
Scotty thinks that all we need is a little more purple and we will be ready for Bonnie's first clue.
I also got this flower panel to use for fussy cutting flowers to add to this log cabin quilt.

Wednesday, November 14, 2012

Yea! A quilt is done...

 The Inspectors looked it over real good and I think that all the threads got buried.
 The back with some added squares to make it wide enough.
I put a scallop in the small red border. Now I will be able to go with my Guild Friends on a field trip to Mary Jo's tomorrow. Soon I will be caught up on Customer quilts. Then I can do some piecing.

Monday, November 12, 2012

Design Wall/machine Monday.....

I have the quilting on Carolyn's quilt half way done. It will not be done until later in the week as we have our guild meeting tonight.
To see what others have on their design Walls go to

Sunday, November 11, 2012

Getting back into the quilting groove...

 I had my machine/RUBY in for general maintenance and cleaning at the end of October. I was surprised at how hard I found it to get back in good graces with RUBY. I have now gotten back into the groove by quilting this kids quilt. It was a top I made awhile ago as an experiment with a part of a jelly roll that came in a scrap bag from Moda.
 I used a solid red on top.
And a variegated thread on the bottom. Whew...Now I think I am ready to quilt on Carolyn's quilt.